What is the construction process of asphalt pavement?
The asphalt pavement should be sealed before construction. When the pavement is formally laid, the surface of the pavement base that has passed the inspection shall be thoroughly cleaned, and then 2 to 3 forest fire extinguishing blowers shall be used to blow off the floating ash in an oblique line in the longitudinal direction, and the surface aggregate shall be exposed as much as possible, so as to facilitate the contact between the asphalt and the base. bond.
Rolling: After the aggregate is spread, it is rolled three times with a tire roller, overlapping 1/3 of the wheel width each time, and the rolling is from both sides to the sides to ensure the effective compaction width. The rolling sequence is from the shoulder side to the middle side.
Maintenance: After the rolling is completed, the traffic can be closed for 7 days and the traffic can be opened.