LB1000 Asphalt Plant in Bangladesh

  • LB1000 Asphalt Plant in Bangladesh
  • Bangladesh
  • October 15, 2016

On October 15, 2016, another asphalt plant was finished in Sinoroader Machinery’s workshop and ready to move. The Asphalt Plant was a set of LB1000 with a productivity of 80TPH; its client was from Bangladesh. The Asphalt Plant adopted water dust collector as secondary dust removal system. The climate of Bangladesh is very humid and rich in rains, thus, few dusts will rise in air. Water dust collector will, on one hand, meet requirements of environmental protection; on the other hand, save clients cost.


2

3

Container stuffing works commenced in the early morning of October 15. Through the diligent efforts of our workers, all components and parts of the plant were stuffed in containers and loaded on trucks by dusk. Later, the plant left our factory for Qingdao Port; its final destination was Bangladesh.

4

5


MANUFACTURER
MARKETING
SINOROADER GROUP
Copyright © 2024 Henan Sinoroader heavy Industry Corporation. Amallink.com