Production Process of Concrete Mixing Plant

February 18th, 2010 concrete batchig plant,concrete mixing plant

Production Process of Concrete Mixing Plant

The concrete mixing plant is a professional equipment for concrete production. It is important to improve the production and quality of the concrete finished product. The production process is also very important. The production process of the concrete mixing plant Routine maintenance ".


微信图片_20200218174050


Production process of concrete mixing plant

1. Venue

Keep it clean, the drainage is smooth, and the relevant signal communication is smooth;

2.Feeding system

The aggregate should be prevented from entering the operating mechanism; generally, sand and cement cannot be fed in the same pipe groove; the materials in the hopper, pipe groove and other parts should be unloaded every time and should not be reserved for the next feeding.

3.Feeding

One feeding and multiple feeding can be used.One feeding is to put the materials into the mixer according to a certain process sequence, but it is not allowed to cast cement first to avoid the cement sticking to the shaft; in order to avoid the cement being wrapped by water to form cement balls during one feeding, you should first Stir the cement and sandstone, disperse the cement, and then spray the water; repeatedly feed the mixed concrete, also known as husk concrete, its feeding operation is more complicated, and special procedures are required in the mixing plant and mixing building. To achieve.

4.Run

During operation, one is to control the measurement accuracy and mixing time to ensure that the process requirements are met; the other is to check for abnormalities and faults, such as whether there is water leakage or slurry leakage at the discharge port.If there are abnormalities and faults, repair them in a timely manner.

5. Shutdown

Before the shutdown, the concrete must be cleaned; before the shutdown is completed, apply a small amount of stones and wash the forced concrete mixer with water; at the same time, clean the mixing site. When there is a sudden power failure or shutdown, the concrete in the host should be cleaned out in time.

6.Security

Any person must follow the operating procedures and safety precautions to ensure safe production.