Installation Steps of Asphalt Mixing Plant

Nov.06th,2020 asphalt concrete mixing equipment,asphalt mixing plant,asphalt storage equipment

With the development of my country's economy, highway construction has also been carried out by leaps and bounds. In highway construction, higher requirements have been put forward for the construction quality of the project. my country's highway construction has gradually completed mechanization. The development of construction mechanization can greatly reduce labor intensity and greatly shorten the construction period. To a certain extent, it also shows the modernization of the level of highway construction.

20201106-1

The mechanization of road pavement includes three primary processes: mixing, paving, and rolling, among which mixing is an important guarantee for ensuring construction quality. In the mixing process, the asphalt concrete mixing equipment is the number one element that determines the project schedule and project quality, and it plays an irreplaceable role in highway construction. Because of its mobilization of various skills such as mechanical, electrical and automation.

In the future, the site selection should carry out a reasonable resettlement plan for the entire construction site. The boiler energy-saving transformation due to the large-scale asphalt mixing plant requires a wide variety of equipment, including the mixing host, asphalt storage equipment, product warehouse, heat transfer oil furnace, and barrel removal machine.Power distribution room, cable trenches, placement of double-layer asphalt pipelines, car electronic scales and parking places for construction vehicles, equipment maintenance workshops, laboratory and stone mixing yard

After the start of construction, there will be more than a dozen kinds of raw materials and products entering and leaving the mixing station. We must make a scientific and reasonable planning and layout of the site to avoid disturbing the normal construction order due to the unreasonable layout.